Brief
Ventilation, Heating, Humidifying, Installations, Power, Lighting, Other Electrical
Background
The restoration work has preserved the Grade II listed chapel’s unique features, some of which date back to when St Thomas’ Hospital opened on its current site opposite the Houses of Parliament in 1870.
Reverend Mia Hilborn, Head of Spiritual Healthcare at Guy’s and St Thomas’ NHS Foundation Trust, says: “Patients, staff and visitors have used this chapel as a place for quiet reflection and prayer for nearly 150 years. It’s a privilege for us to be able to share these moments with them in such a beautiful and historic space.”
The restoration work was funded by a grant from Guy’s and St Thomas’ Charity and donations from The Perseverance Trust, the Friends of St Thomas’ Hospital and more than 500 individual donors who were thanked at the service.
Ventilation
Remove and clean all ventilation ducts and grilles, supply and replace where necessary.
Carry out the works to the ventilation wind catcher on the roof, clean it and provide future access to the internal grille for maintenance. Access to the roof will be required and will be supplied by the main contractor
Heating
Remove radiators, strip off old paint, service them and have them air tested before repainting them to match the existing colour. Re- install the radiators and supply and fit zone valves and associated controls. Supply and fit electrical panel radiator in the tabernacle room.
Humidifying
Supply and fit a humidifier for the Chapel organ or relocate the existing humidifier
Ensure that the cold-water supply to the humidifier is sufficient and modify where necessary.
Installations
Fire Alarm
A new system shall be installed to cover all areas including the voids above the North & South Aisles. The new system would need to be linked to the Hospital’s main system, complete with ‘double-knock’ activation and work within the ‘cause and effect’ operation of the Hospital’s main system. The new system shall also have a facility to isolate it from the Hospital’s main system, to enable certain services to be carried out where smoke may cause a false alarm.
Intruder Alarm
A new system installed to protect the Organ and Sanctuary areas.
Sound System
Is new, in working order and shall be retained.
Induction Loop System
Is new, in working order and shall be retained.
Power
New general power, fed by new ring circuits comprising bare MICC cable, shall be provided, as follows:
• 1no. 13-amp twin socket outlet installed on each pillar along both sides of Chapel, (Total of 12no twin socket outlets).
• 2no. twin socket outlets installed on each side of the Sanctuary.
• 2no. twin socket outlets to serve areas on each side of the organ.
• Supplies to the Organ and sound system equipment, adjacent to the organ, to be renewed.
• 2no. twin socket outlets and 2no. Switched fused connection units, (heaters), installed in the Tabernacle.
Lighting
A new system of lighting, wired in bare MICC cable, shall be provided. It shall include emergency lighting and signage. Lighting within the Chapel shall be provided with scene-setting controls to provide appropriate lighting for various ceremonies/occasions.
Other Electrical
Main Supply
Replace existing 2-core PVC/SWA cable with a 3-core OHLS/SWA cable, with the third core used as a CPC, to provide a superior earth-fault return path.
Distribution Board
Replace existing with new, lockable distribution board to provide more circuit-ways, complete with RCBO protection.